• Home
  • Projects
    • Infrastructure Projects
      • Ports & Marines Infrastructure
      • Water Management
      • Roadway
      • Power Transmission
    • Buildings Projects
      • Private Housing/Residential
      • Industrial
      • Administrative/Commercial
      • Educational
      • Hospitality
    • Landscape Projects
      • Landscape Works
  • About Us
  • Certificates
  • News
  • Contact us

Projects / Infrastructure Projects /

 

Ports & Marines Infrastructure


  • Construction Of Export Terminal – Badr Dry port
  • RO4.1 & RO4.2 Feed Lines And Reject Lines & Product Lines (Egyptian Fertilizer Company)
  • Extension Container Terminal Area A – Basin 1, DP World Sokhna Port, Egypt
  • Sea Water Intake Pit – Basin 3 Liquid Bulk Terminal, Sokhna Port, (Sonker)
  • New Truck Parking Area at Main Gate 1, DP World Sokhna Port, Egypt
  • Basin 2 of DP World , Sokhna Port (Excavation by Dewatering)
  • Bridge (Abutment and Bents) and Loading Platform – Basin 3 Liquid dry Bulk Terminal, Sokhna Port (PMS)
  • 15-Hour Extension Liquid Terminal Sokhna – Basin 3, Sokhna Port
  • Pavement Extension Area (B) – Basin 1, Sokhna Port( DP World) , Egypt
  • The Infrastructure Project, Sugar Refinery, Sokhna Port
  • Metal Safety Fence, Al-Ain El-Sokhna
  • Paving Works Project for Slaughter House – Sokhna Livestock, Sokhna Port
  • Paved Area West Workshop – Basin 1, Sokhna Port
  • Tank Farm – Basin 3 Liquid Terminal Sokhna port, Sokhna Port
  • Truck Parking Area & Car Shed of Head Office, Sokhna Port

Contact info


Villa 128, El Narges 1, South 90th Street, 5th Settlement, New Cairo, Egypt.


Phone: +2 26783734
Cellular:+20106 880 77 67
Fax:+2 26783739
info@ecct-eg.com

© 2025 ECCT- Website By by WinningSEM