  • All internal roads with area 40,000 m2 made off interlock stress 500 kg/cm2, including excavation, soil replacement, base coarse layers.
  • Smooth surface walkways made off RC slabs 3,000 m2 including joints.
  • External lighting network including install 60 lighting poles 10m high, 1800 ML of cables, electric panels & connecting to substations.
  • Sewage UPVC Pipe, 400 ML, Diameters varied from 110 to 315 mm.
  • RC open channel drain 250 ML, width 80 cm & varied depth 80 – 130 cm.
  • Ground tank 50 M3 made of RC, including the Electromechanical works such as movable submerged pumps & its control panels