Project Description:

  • Excavation & transport of 106,000 m3.
  • Soil replacement of well graded base coarse 64,000 m3.
  • Duct banks of multi PVC pipe inside concrete envelope 560 ML.
  • 3 high mast 45 ML complete with foundation, lighting fixture & 1580ML cable for power supply.
  • Concrete paver blocks 500 kg/cm2 total area 64,000 M2.
  • RC retaining wall & chain link fence total 450 ML.