_

Paved Area West Workshop - Basin 1, Sokhna Port, Egypt

_

Project Information:

ECCT
_

Project Description:

  • Excavation & transport of 60,000 m3.
  • Soil replacement of well graded base coarse 42,000 m3.
  • Duct banks made of multi PVC pipe inside concrete envelope 360 ML.
  • Supply & install concrete paver blocks 500 kg/cm2, area 42,000 M2.
  • Three high mast 45 ML complete with foundation, lighting fixture & 1300 ML cable for power supply.
  • Chain link fence total 500 ML.
  • Firefighting pipe line & hydrants, manholes, slot drain 230 ML.
  • Sewage line 6” PVC pipes, total 650 ML.