_

Main Entrance Road – Taj Sultan Project, New Cairo

_

Project Information:

ECCT
_

Project Description:

  • Project Main Road with over 35,000m2 paving with Paver Block strength of 400 kg/cm2.
  • Road Length over 4,000ml.
  • Curb Stone over 6,000ml.
  • Project Construction period 25 days.