Project Description:

  • Demolishing works for about 3,000 m3 of concrete & many UG utilities.
  • Excavation & transport to dump area of 116,000 m3.
  • Soil replacement of well graded base coarse of 110,000 m3 in layers.
  • Concrete paver blocks 500 kg/cm2 total area 82,000 M2, complete with roads & slot marking.
  • Duct banks made of multi PVC pipe inside concrete envelope total 1790 ML.
  • Electric cables for MV, LV & fiber optic cable, total 7,110 ML complete with RC manholes.
  • Four high mast 45 ML complete with foundation & lighting fixture.
  • Four containerized sub stations complete with 1 MVA transformers by ABB, switchgear, panels by Schnieder.
  • SCADA system by Siemens for monitoring substations’ switchgears & lighting control.
  • Firefighting pipe line HDPE 315 mm 640 ML complete with hydrants & manhole.
  • RC Slot Drain on a 300 mm PVC pipes, drainage pipe line 400-500 mm PVC pipe & 750 mm concrete pipe total 1,265 ML.
  • Construction of sanitary & substation RC buildings complete with all finishes and RC leakage pit 7.4 m x 20.7 m