EGYPTIAN COMPANY

EGYPTIAN COMPANY CONTRACTING & TRADING

Steel Bridge for belt conveyer Sugar refinery, Al-ain El-Sokhna Port Steel Bridge for belt conveyer Sugar refinery, Al-ain El-Sokhna Port Steel Bridge for belt conveyer Sugar refinery, Al-ain El-Sokhna Port
Home » Projects » Steel Structure Work » Steel Bridge for belt conveyer Sugar refinery, Al-ain El-Sokhna Port

Steel Bridge for belt conveyer Sugar refinery, Al-ain El-Sokhna Port

Belt Conveyer to convey row sugar from port to the storage
area inside the sugar factory:

  • Plain and reinforced concrete footings and pedestals for conveyor.
  • Steel structure for the belt conveyer, 120 Ton.
  • Paved area for sugar storage, 1000 M2
  • Protection poles for footings and conveyor.

Completion date: Apr 2007

Completion value: 1,500,000 EGP

Consultant: TATE & LYLE consultation office

Latest Events

  • Area A Project

    In 20 march 2012 ECCT celebrated with all the project “Area A” parties with the success in […]

    Read More