EGYPTIAN COMPANY

EGYPTIAN COMPANY CONTRACTING & TRADING

EPC the Extension of slaughter house Sokhna livestock, Al-ain El-Sokhna Port EPC the Extension of slaughter house Sokhna livestock, Al-ain El-Sokhna Port EPC the Extension of slaughter house Sokhna livestock, Al-ain El-Sokhna Port
EPC
Home » Projects » Steel Structure Work » EPC the Extension of slaughter house Sokhna livestock, Al-ain El-Sokhna Port

EPC the Extension of slaughter house Sokhna livestock, Al-ain El-Sokhna Port

  • Excavation, Soil replacement, backfilling & R.C foundation.
  • Steel structure, total 9 ton of hot-dip galvanized steel sections and covered by sandwich panels having a stainless steel face.
  • Internal utilities such as lighting & water proof power sockets 220,380V), water lines, sewage network, compressed air lines and
    ventilation system changes the air inside the building 20 times hourly.
  • Hanged galvanized steel rail tracks for circulating the carcass.
  • PC slab on grade around the extension with area of 240 m2, surface drainage system made of stainless steel channels.
  • Underground RC sewage tank 75 m3, with inside and the outside waterproofing & the water test of the tank.

Completion date: Jan 2010

Completion value: 1,500,000 EGP

Consultant: Sokhna livestock Company, Eng Department.

Latest Events

  • Area A Project

    In 20 march 2012 ECCT celebrated with all the project “Area A” parties with the success in […]

    Read More