Sokhna Port-Extension container terminal at Basin 1 (Area A) Sokhna Port-Extension container terminal at Basin 1 (Area A) Sokhna Port-Extension container terminal at Basin 1 (Area A)
(Area A) Sokhna Port - Extension container terminal at Basin 1
Home » Projects » Ports » (Area A) Sokhna Port – Extension container terminal at Basin 1

(Area A) Sokhna Port – Extension container terminal at Basin 1

Owner: DP World Ports Authority

Main consultant & Management: Amiral Technical Management & Services (ATMS)

Main Designer: Material Handling Consultants (MHC)

Consultant Sub Consultant: Engineering Consultant Group (ECG)

Contractor Sub Consultant: Electrometer Design Center for Elec. Work (EDC)

Compellation date: January 2012

Project Period: 6 months

Compellation Value: 48000000 EGP

Project Facts

  • Demolashing of 3000 m³ concrete & about 4000 m underground infrastructure.
  • Excavation & transport to dump area of 125000 m³.
  • Soil replacement of well compacted graded Base course of 100000 m³ in layers.
  • Concrete paver blocks 500 kg/cm² special manufacturing of 90000 m².

Infra-Structure:

  • Fire Fighting line HDPE 315 mm 20 bar 650 Lm complete with hydrants,values & manholes.
  • Duct banks made of multi PVC pipes inside concrete in casement total 1800 LM.
  • RC Slot Drain on 315 mm PVC pipe inside concrete in casement.
  • Drainage system PVC 400 & 500 m & concrete pipes 800 mm.

Project Buildings:

  • Sanitation Building with industrial euup.
  • Substation Building with New Elec. Panels to accommodate IKVA transformer.
  • Leaking Pit to accommodate dangerous containers 20, 40 & US Feet.

Electro Mechanical Work:

  • Four high must 45 m complete work.
  • Eight Steel Structure reefer racks 100 ton with three phase Sockets, Panels 7 Lighting.
  • Four containerized substation complete with IKVA transformers, switchgear, Elec. Panels & ring main units.
  • Complete working Scada system to control the power supply.

Latest Events

  • Area A Project

    In 20 march 2012 ECCT celebrated with all the project “Area A” parties with the success in […]

    Read More