Basin 3 Liquid Terminal Sokhna, Al-Ain El-Sokhna port. Basin 3 Liquid Terminal Sokhna, Al-Ain El-Sokhna port. Basin 3 Liquid Terminal Sokhna, Al-Ain El-Sokhna port.
Home » Projects » Ports » Tank Farm – Basin 3 Liquid Terminal Sokhna port

Tank Farm – Basin 3 Liquid Terminal Sokhna port

  • Grubbing, Grading & disposal to dump area, total 152,000 M2.
  • Backfill with compaction in layers, total 200,000 M3.
  • Chain link fence 2.5m height, total 1,300 ML & a steel gate 6 M wide.
  • EPC the steel structure of a site office 9m x 25 m & car shed, total 12 ton & RC foundation.
  • All internal finishes, Plumbing, air conditioning, furniture, electrical, communications and data networks.
  • External utilities as water supply, sewage drainage piping, soak away, water tank, lighting, soft landscaping & electric generator 150 KVA.

Completion date: Jan 2011

Completion value: 6,000,000 EGP

Consultant: ATMS