Rehabilitation of the water & cooling, Abu Zenima – Sinai

  • Removal of the old steel pipelines and mixing manifolds.
  • New HDPE pipelines 1250 ML inside & outside the two pump stations, diameters from 3″ to 18″ including pipe welding & testing.
  • Three mixing manifolds made of HDPE pipes 18 inch diameter.
  • New HDPE potable water pipeline 460 ML, 6-8 inch diameter including valves, earth work & pipe welding.
  • New HDPE industrial pipeline 400 ML, 4 inch diameter including earth work & pipe welding.

Completion date: Dec 2009

Completion value: 1,250,000 EGP

Consultant: Sinai Manganese Co, Engineering Department.