Pre-Cast Retaining wall SDPC, Al-ain El-Sokhna Port

  • Two layers of backfilling 25 cm each (900 m length and 4 m width).
  • Casting, transport and install pre cast retaining wall 25 cm thickness, 3.0 m high and its footing is (3 x 3 x 0.25/0.15 m)

Completion date: Dec 2008

Completion value: 1,220,000 EGP

Consultant: ATMS